Report
on Progress on Bogibil Rail-cum-Road Bridge Project
The
proposed bridge site (Longitude 94’ 45’-46” ,
Latitude 27’2’-422” Axis 315’-07’-05”) has been located at
approximate 17 Km. Downstream of Dibrugarh town. It has been connected to
National Highway No 37 on south bank at Km 580.788 and to NH No. 52 on north
bank at Km 307.826. The Rail approach on south bank is connected to Chowalkhowa
Railway Station at a distance of 5.83 Km from Dibrugarh and between Sisi Borgaon
and Sirpani Railway Station on North bank at Km 382.005 of the existing MG
Railway line. The length of the bridge is 4315.20 Mtr. The cost of the bridge
along with the approaches etc. have been worked out as Rs.1670.82 corers with
the base price level of FY 2000-01. The Moranhat Rail connection is also
proposed to be provided with the bridge for which the report and estimates
are prepared by NF Railway. If the cost of Moranhat Rail link, i.e.
Rs.91.24 corers is also added, the total cost of the bridge works out to Rs.
1762.06 corers. The project includes
the connection of Moranhat by new rail line from Dhamal gaon Station.
A new railway station, New Dibrugarh Rail Station, will be constructed at
Boiragimoth Kachari gaon, nearby the Dibrugarh city for which land measuring 404
bighas is earmarked. The proposed new station will be biggest in the region.
There will be approaches for both rail and road.
STATUS
REPORT ON LAND ACQUISITION FOR RAIL APPROACH TO BOGIBIL BRIDGE PROJECT :
Land Acquisition Cases The Railway Department completed giving alignment of the Rail approach of
23.58 KM stretch on 25.1.2002. The alignment runs through 19numbers of villages
in three mouzas . Total 19 Nos. of
L.A. Cases have already been framed for acquiring more or less 1295 Bighas of
land from these villages .
In the meantime Notification u/s 4(1) have already been published in
official gazette in all
L.A.
cases.
With consent and co-operation of the pattadars zirat enumeration
and field enumeration have
been completed and estimates are prepared for 16 cases for Rs 7.83 corers.
So far Government land is concerned 3 Nos. of
proposals for transfer of land under Land Transfer Rules have been
submitted to Government for an area of 192B-2K-5L . Proposal for transfer has
been submitted to the Government and the estimate has been submitted to the
Railway authority.
TEMPORARY
ALLOTMENT OF LAND FOR WORKSITE
The Government has already approved the proposal of temporary handing over of
900 Bighas of government land for 3 years on rental basis at the rate of Rs 5
lakh per annum. The land is near Bogibil bridge site and has been handed over.
The meeting with Railway officials have been conducted and this has already been
informed to them.
LAND
ACQUISITION FOR APPROACH ROAD
During
the meeting with Railway officials it was stated that there would be separate
approach road for motor vehicles for which the Ministry of Surface Transport
would start the exercise of land acquisition separately. However, till now we
have not yet received any such communication from the Ministry of Surface
Transport or Railway authority for land acquisition for motor vehicles.
HANDING
OVER OF SERVICE ROAD TO RAILWAY AUTHORITY
The service road has already been handed over by the respective departments like
PWD(R) , DRDA, E & D etc. as reported by the Railway officials in the
meeting. This will help in the initial preparatory work
to be carried out by Railway authority.
Regarding
the acquisition of
twenty four KMs from Damalgaon
to Moran , the Railway authorities have informed that the approval
has not come from the Railways Board. The approval for the acquisition of
land as well as laying of railways track in between the two stations should be
given. It may be mentioned that with the proposed line, the distance will be
shortened by more than 60 KM and the people of Moran and the neighboring areas
will get the benefit of Railways head.
|